Format final du prototype papier n°1:
Maintenance Management Report Pride
Drill Ship
Period from xxxx to yyyyy
MR Pending
% overdue
ISPS overdue
ISM overdue
%WSCH
%WMATL
%WOPCOND
Preventive Maintenance: MMR v0.1b
|
CE
|
ENG
|
HYD
|
MAR
|
RM
|
STP
|
Total
|
Reference
|
Delta
|
INPRG
|
|
|
|
|
|
|
|
|
|
WMATL
|
|
|
|
|
|
|
|
|
|
WSCH
|
|
|
|
|
|
|
|
|
|
WOPCOND
|
|
|
|
|
|
|
|
|
|
CLOSE
|
|
|
|
|
|
|
|
|
|
CAN
|
|
|
|
|
|
|
|
|
|
|
CLOSE man hrs
Note: Overdue is after 25% of the period of the PM.
% WSCH
%WMATL
ISPS overdue
ISM overdue
MR Pending
%WOPCOND
%PM/CM close
Total (h):
Top 10 list of the CM man hours
consumption:
P-4
P-3
P-2
Period
P-1 month
Equipment down:
P-5 and +
Hours
Hours
Equipment#
Equipment#
Designation
Designation
Corrective Maintenance:
|
CE
|
ENG
|
HYD
|
MAR
|
RM
|
STP
|
Total
|
Reference
|
Delta
|
INPRG
|
|
|
|
|
|
|
|
|
|
WMATL
|
|
|
|
|
|
|
|
|
|
WSCH
|
|
|
|
|
|
|
|
|
|
WOPCOND
|
|
|
|
|
|
|
|
|
|
CLOSE
|
|
|
|
|
|
|
|
|
|
CAN
|
|
|
|
|
|
|
|
|
|
|
CLOSE man hrs
PM#
Due Date
Equipment#
Designation
Equipment designation
Major PM prevision: Over 2 Years, or
10000h for the next month.
|