3.2.2.2 Organizational reengineering
It entails an impact study on the re-organization and
re-structuring for the following different units
(services/department/sub-departments/divisions) of AESS to be impacted by this
new system for re-organization 
1. Generation department 
1.1. Hydro power stations: Edea and Songloulou 
 
 
·  Operation divisions 
·  Electrical division: light current and heavy
current 
·  Mechanical division 
·  Performance and reporting 
1.2. Thermal power stations: Limbe; Dibamba; Oyomabang I and
II; Bassa 2 and 3; Bafoussam and Logbaba I and II 
 
 
· Operation divisions 
· Electrical division: light and heavy current 
· Mechanical division 
· Performance and reporting 
2. Networks department 
· SCADA and telecommunications division 
· Performance and reporting division 
· HV/MV line maintenance division 
· Substation operation and maintenance 
· Automation and protection 
3. Networks operation department 
· Grid operations division 
· Hydrology sub-division 
· Metering and scheduling division 
· Information system division 
· Grid code and documentation division 
Re-structuring and re-configuration (organizational
reengineering) should be done in terms of  
ü New units created 
ü Mission (objectives) 
ü Resources: human and technology 
ü Principal activities 
ü Training  
ü Job positions (new job positions) 
ü Job description 
 |