3.2.1.1.1.3: Systems Operation and Business Integration
(BI)
AESS staff for the following functions
- Deputy Project Director for BI teams coordination,
ensure information system integration for corporate objective effectiveness and
overall IT overseer
- Network team leader to implement BI for network
operations and assist in the supervision of the SCADA/EMS project
- Planning and Dispatching team leader to implement
BI in planning and dispatching and modeling overseer
- IT integration team leader to provide and implement
IT infrastructure for the overall PMS system
AESS staff for Business Integration functions in
v Planning and dispatching such as collection of
network technical parameters, check accuracy of forecasting model, strategic
outlook of business transformation through business integration (apply APEX
deliverables), modeling overseer e.t.c
v Network Integration such as master data
preparation, confirm interoperability of existing switchgear, issues connected
to operation and maintenance, communication to all stake holders within the
network e.t.c
v IT integration such as implementing data center and
IT control rooms, implement telecommunications over IP (fiber optic, MAN/LAN
cabling, GSM, GPRS and satellite), ensure AESS IT maintenance capabilities,
provide data referencing and conversion platforms (Dataware house and GIS)
AESS staff for System Operation and day-to-day system running
functions in
v Planning and dispatching
v Network operations (supervision and control, interventions,
maintenance...)
v IT
3.2.1.1.2: Civil, Construction and adaptation Works
Some civil, construction and adaptation works which are the
responsibilities of AESS and are required for the implementation of this new
system include
Ø All external works such as paved areas, car parking,
landscaping and construction of a higher perimeter wall and a guardhouse
respectively around the premises and at the entrance to the Bali compound
building except for everything that concerns the installation of the generating
set.
Ø Construction of a second transformer substation in
the NSCC yard behind the building
Ø Provide connection between the two transformer
substations and the AC room of the NSCC for the contractor to connect to the
power supply
Ø Painting of the external walls of the first and
ground floor of the Bali building to harmonize with the entire building
Ø Refurbish the entire building both internally and
externally including the roof in time so as to intervene as little as possible
with the works to be executed by the contractor.
Ø Refurbishment and equipment of the room CCR (Centre
de conduit de reseau) room in Douala
3.2.1.1.3: Telecommunication Infrastructure
The telecommunication infrastructure associated to the SCADA
system responsible for voice and data communication is of full responsibility
of AESS. The functional effectiveness of the telecommunication infrastructure
is critical for the implementation of the new system. The following are very
critical for the system implementation
Ø Connection of FO between the NSCC and the various
users-de Gaulle, Koumassi, Bassa e.t.c
Ø Connection of multiple sites in Oyomabang, Bafoussam
e.t.c
Ø Connection of FO to NCC and YCC
Ø Voice recorders at the NSCC, YCC and NCC
Ø Surveillance of RTU and process by surveillance of
FO
Ø Installation of radio communication in NSCC, YCC and
NCC
Ø Installation of Telephones and internet in the Bali
building, NSCC, NCC and YCC
There are six telecommunication networks (PLC, OHTL, GSM,
Satellite, microwave and VHF radio) associated to this SCADA system. The figure
below shows the actual state of the FO and PLC networks of the AESS SIG
|