Requirement study for the business integration of the new SCADA/EMS system on the AES SONEL network in Cameroon

( Télécharger le fichier original )
par Mbelli Njah Fongha
Polytechnic,Yaounde - Masters Engineering in Electrical Engineering(Diplome d'ingenieur de conception avec option Genie Electrique) 2009
  

précédent sommaire suivant

Bitcoin is a swarm of cyber hornets serving the goddess of wisdom, feeding on the fire of truth, exponentially growing ever smarter, faster, and stronger behind a wall of encrypted energy

3.2.1.1.1.3: Systems Operation and Business Integration (BI)

AESS staff for the following functions

- Deputy Project Director for BI teams coordination, ensure information system integration for corporate objective effectiveness and overall IT overseer

- Network team leader to implement BI for network operations and assist in the supervision of the SCADA/EMS project

- Planning and Dispatching team leader to implement BI in planning and dispatching and modeling overseer

- IT integration team leader to provide and implement IT infrastructure for the overall PMS system

AESS staff for Business Integration functions in

v Planning and dispatching such as collection of network technical parameters, check accuracy of forecasting model, strategic outlook of business transformation through business integration (apply APEX deliverables), modeling overseer e.t.c

v Network Integration such as master data preparation, confirm interoperability of existing switchgear, issues connected to operation and maintenance, communication to all stake holders within the network e.t.c

v IT integration such as implementing data center and IT control rooms, implement telecommunications over IP (fiber optic, MAN/LAN cabling, GSM, GPRS and satellite), ensure AESS IT maintenance capabilities, provide data referencing and conversion platforms (Dataware house and GIS)

AESS staff for System Operation and day-to-day system running functions in

v Planning and dispatching

v Network operations (supervision and control, interventions, maintenance...)

v IT

3.2.1.1.2: Civil, Construction and adaptation Works

Some civil, construction and adaptation works which are the responsibilities of AESS and are required for the implementation of this new system include

Ø All external works such as paved areas, car parking, landscaping and construction of a higher perimeter wall and a guardhouse respectively around the premises and at the entrance to the Bali compound building except for everything that concerns the installation of the generating set.

Ø Construction of a second transformer substation in the NSCC yard behind the building

Ø Provide connection between the two transformer substations and the AC room of the NSCC for the contractor to connect to the power supply

Ø Painting of the external walls of the first and ground floor of the Bali building to harmonize with the entire building

Ø Refurbish the entire building both internally and externally including the roof in time so as to intervene as little as possible with the works to be executed by the contractor.

Ø Refurbishment and equipment of the room CCR (Centre de conduit de reseau) room in Douala

3.2.1.1.3: Telecommunication Infrastructure

The telecommunication infrastructure associated to the SCADA system responsible for voice and data communication is of full responsibility of AESS. The functional effectiveness of the telecommunication infrastructure is critical for the implementation of the new system. The following are very critical for the system implementation

Ø Connection of FO between the NSCC and the various users-de Gaulle, Koumassi, Bassa e.t.c

Ø Connection of multiple sites in Oyomabang, Bafoussam e.t.c

Ø Connection of FO to NCC and YCC

Ø Voice recorders at the NSCC, YCC and NCC

Ø Surveillance of RTU and process by surveillance of FO

Ø Installation of radio communication in NSCC, YCC and NCC

Ø Installation of Telephones and internet in the Bali building, NSCC, NCC and YCC

There are six telecommunication networks (PLC, OHTL, GSM, Satellite, microwave and VHF radio) associated to this SCADA system. The figure below shows the actual state of the FO and PLC networks of the AESS SIG

précédent sommaire suivant